EPIC ARGO

For this project, our team was able to prep the site and install concrete foundations.

We then provided sub-contractors to bring over utilities needed for the process skids constructed by Epic Systems.

When the three skids were delivered to the site, we provided the knowledgeable and trained millwrights to unload the 120,000-pound structures and place them on the foundation.

Once the skids were in position, our electrician and pipe fitters performed the work needed to connect the skids together and to the utilities.

LOCATION

Ames, IA

GENERAL CONTRACTOR

Harlan Co

ARCHITECT

Epic Systems